
Case Study
A Case Study
MCB Copper-Gold Project — Philippines
Global Geologica was engaged to implement an industry-compliant relational database solution to optimize the management of exploration data for this significant copper-gold deposit.
-
Historical data with different structure requiring integration with new exploration data.
Compliance with JORC and NI 43-101 reporting standards.
The need for seamless integration with GIS and 3D modeling software.
-
Designed a centralised, secure database structure ensuring data integrity and accessibility.
Implemented automated various validation checks to minimize errors and improve reporting accuracy.
Integrated spatial data outputs into with GIS and 3D modeling tools for enhanced geological interpretationt goes here
-
Significant reduction in data processing time, improving efficiency and accelerating decision-making.
Enhanced visualization and analysis of geological data, resulting in accelerated and more accurate resource assessment.
Improved compliance and audit readiness with standardized reporting formats.
Enhanced collaboration between geologists and stakeholders.
Through our tailored database solutions, the MCB Copper-Gold Project achieved a more efficient and reliable data management system, ultimately supporting strategic exploration and development efforts.
Donec id justo non metus auctor commodo ut quis enim. Mauris fringilla dolor vel condimentum imperdiet.